IBM C9010-251 Newest Practice Questions, C9010-251 Free Study Papers

By blog Admin | Posted Thu, 05 Jul 2018 16:14:48 GMT
Valid C9010-251 Dumps shared by newpassleader.com for Helping Passing C9010-251 Exam! newpassleader.com now offer the newest C9010-251 exam dumps, the newpassleader.com C9010-251 exam questions have been updated and answers have been corrected get the newest newpassleader.com C9010-251 dumps with Test Engine here:
https://www.newpassleader.com/IBM/C9010-251-exam-preparation-materials.html
(158 Q&As Dumps, 30%OFF Special Discount: 30free)


NEW QUESTION NO: 10
In what case, all I / O must be virtualized ?
A. When an AIX 7 WPAR belong to a global environment.
B. When using PowerVM Enterprise Edition and Enterprise Edition with PowerHA.
C. When an IBM i partition belong to dry another IBM i partition.
D. When a logical partition when using a shared storage pool (SSP).
Answer: D

NEW QUESTION NO: 11
An AIX customer is running AIX 5.3 on a POWER7 machine and wants to run this workload on a POWER8 server without upgrading their operating system.
What is their best option to migrate their workload?
A. Power HA failover
B. Live Partition Mobility
C. Versioned WPAR
D. Power VC
Answer: B

NEW QUESTION NO: 12
In which situation must all I/O be virtualized?
A. When using PowerVM Enterprise Edition with PowerHA Enterprise Edition.
B. When an LPAR makes use of a Shared Storage Pool (SSP).
C. When an IBM I partition is hosted by another IBM I partition.
D. When a WPAR is hosted by an AIX 7 global environment.
Answer: C

NEW QUESTION NO: 13
A customer anticipates having very heavy network and storage I/O traffic across their virtualized environment. They are interested in segregating the I/O workloads. They also want to be able to perform maintenance on their VIO Servers without downtime.
Which option will satisfy their requirements?
A. (2) VIO Servers, each handling a portion of the traffic
B. (4) VIO Servers, two handling network and two handling storage
C. (4) VIO Servers, each handling a portion of the traffic
D. (2) VIO Servers one handling network and one handling storage
Answer: D

NEW QUESTION NO: 14
Customer recently installed a new six- core S824, with ( 18 ) SFF-3 bay storage HDD disk backplane completely filled . They want to include ( 4 ) SSD solid state drive, the data in order to improve the thermal performance. Customers want to avoid adding a EXP24S I / O drawer to place the SSD costs .
Which of the following to meet customer requirements in order to improve the performance of hot data ?
A. plus an eight-slot 1.8-inch solid state drive cage backplane
B. plus a USB SSD cage connection
C. plus an SSD SAS bay PCIe Riser
D. plus a PCIe RAID and SSD SAS adapter
Answer: A

NEW QUESTION NO: 15
What benefit does the CAP I feature of POWER8 provide?
A. The ability to attach accelerators that have shared memory access that is coherent with the system's processors.
B. An alternative to memory lock base synchronization.
C. The ability to dispatch multiple virtual machines on a single core at the same time.
D. An implementation of AME on a hardware accelerator.
Answer: C

NEW QUESTION NO: 16
A customer has two Power 570 servers that need to be replaced to accommodate company growth.
The first server runs a transactional workload with high server usage during the day (8am-8pm) The second server runs analytic queries based on the transactional data during the night (10pm-6am).
A technical sizing analysis determined that each server would require (18) POWERS 3.52GHz cores and
160GB RAM, considering the needed growth.
What would be the most cost-efficient way to satisfy the customer needs?
A. (2) new Power S824 with 20 cores and 192GB RAM each.
B. (1) new Power S824 with 36 cores and 384GB, virtualized with capped LPARs.
C. (1) new Power S824 with 24 cores and 384GB and DLPAR CPU resources among LPARs
D. (1) new Power 770 with 36 active cores and 384GB active, virtualized with capped LPARs
Answer: D

NEW QUESTION NO: 17
What is used to provide basic deployment and management firmware updates, host monitoring and Virtual Machine templates of Power KVM hosts from a GUI?
A. virsh
B. PowerVC
C. HMC
D. Kimchi
Answer: B

NEW QUESTION NO: 18
A customer has a SAN team that wants to be able to easily map each LUN to a specific WWPN on each client LPAR of a POWER8 server.
Which technology should be implemented to satisfy the requirement?
A. NPIV
B. vSCSI
C. iSCSI
D. SAS
Answer: B
Explanation/Reference:
Explanation:
Reference:
http://www.ibmsystemsmag.com/ibmi/administrator/lpar/vios-revisited/

NEW QUESTION NO: 19
A client would like to user Power servers to reliably manage large volumes of structured and unstructured data using the Hadoop open source framework.
Which IBM offering will satisfy their requirement?
A. IBM Infosphere Master Data Management
B. IBM InfosphereBigInsights
C. IBM Infosphere Streams
D. IBM Infosphere Clinical Analytics
Answer: B
Explanation/Reference:
Explanation: IBM InfoSphere BigInsights Enterprise Edition manages and analyzes Internet-scale volumes of structured and unstructured data. Built on the open source Apache Hadoop software framework, it enhances this technology by adding administrative, workflow, provisioning, and security features, along with sophisticated analytical capabilities from IBM Research.
Explanation:
Reference:
http://www.redbooks.ibm.com/abstracts/tips1170.html?Open

NEW QUESTION NO: 20
Which technology provides dedicated virtual resources for virtual machines, improved quality of service and offloads I/O virtualization?
A. SR-IOV (Single Root I/O Virtualization)
B. PowerVM
C. FCoE (Fiber Channel over Ethernet)
D. CAN (Converged Network Adapter)
Answer: A
Explanation/Reference:

NEW QUESTION NO: 21
A customer would like to have a mix of SSD and HDD on their S824 using the Expanded Function (18 disk) backplane (EJOP) and does not want to use Easy Tier functionality.
How can this be accomplished?
A. Split the backplane and put the SSDs on one side of the backplane, and the HDDs on the other.
B. Configure all drives using RAID 5T2.
C. Configure the SSDs and HDDs in separate arrays.
D. Install the SSDs in the EJTM 8-Bay 1.8" SSD Cage.
Answer: C

NEW QUESTION NO: 22
Easy Tier feature on what support S822?
A. (12) drive, do not split backplane
B. (12) drives and a split backplane
C. (8) drives and a split backplane
D. (8) SAS drives and an auxiliary controller
Answer: D

NEW QUESTION NO: 23
A customer wants to save on IBM i licensing costs:
They have three configurable processors and one IBM i license.
LPAR1 is running IBM i with .5 CPU
LPAR2 is running IBM i with .5 CPU
LPAR3 is running AIX with 1 CPU
All of the LPARs are uncapped.
They want to limit the IBM i LPARs to using one core.
How can the customer enforce the limit and save on their IBM i licensing costs?
A. Put the AIX LPAR in a shared processor pool with one core.
B. Set the entitlement of each IBM i LPAR to "one"
C. Change the AIX partition to have .5 CPU entitlement.
D. Put the IBM i LPARs in a shared processor pool with one core.
Answer: B

NEW QUESTION NO: 24
A customer is ordering a 4-core S814 with the following partitions. The default processor pool will be used.
An IBM i partition capped at 1.0 processors.
A second IBM i partition capped at 0.5 processors.
An AIX partition capped at 0.5 processors.
A Linux partition capped at 0 5 processors.
How many IBM i processor licenses are required to support this configuration?
A. 4.0
B. 3.0
C. 1.0
D. 2.0
Answer: C

NEW QUESTION NO: 25
Compared with 720 quad-core, four -core S814 What added to the standard features to improve RAS capabilities?
A. RAID 0
B. alternate processor recovery (Alternate Processor Recovery}
C. Chipkill Memory
D. Support PCIe Hot
Answer: C

NEW QUESTION NO: 26
A customer has a partitioned system running IBM i and Domino. The customer is considering a new system to replace the existing system and wants to add a Web Sphere application and an AIX application.
Which of the following will assist in sizing the new system?
A. Snap Shot
B. System Planning Tool (SPT)
C. Workload Estimator (WLE)
D. Performance Management (PM) for Power Systems
Answer: D

NEW QUESTION NO: 27
A customer wants to install a POWER8 tower system at a remote site. The system will run Red Hat Linux.
Which system is the best option for the requirement?
A. S824
B. S814
C. S812L
D. S822L
Answer: D

NEW QUESTION NO: 28
Which of the following is a stand-alone offering in the Power SC family, that provides a consolidated view of the virtual data center VM network isolation landscape?
A. Real-time Compliance Management
B. Trusted Firewall
C. Trusted Network Connect
D. Trusted Surveyor
Answer: B

NEW QUESTION NO: 29
Which statement is true regarding Power Systems being positioned as an open platform?
A. OpenStack management allows for a single HMC to provide centralized management across the whole private cloud.
B. PowerKVM allows clients to standardize on a single open source virtualization technology among RISC and x86 servers.
C. CAPI allows clients to consolidate multiplatform workloads by attaching other manufacturer processors (like Intel or Oracle) on the servers.
D. Linux on Power allows clients to transparently migrate workloads from Linux x86 servers via Live Partition Mobility.
Answer: B

NEW QUESTION NO: 30
A customer is migrating a POWER6 520 to a 6-core S814. Which backplane will offer the best RAID 5 performance?
A. Split Backplane with 6+6 SFF-3 Bays and second SAS controller
B. Split Backplane with PCIe3 12GB Cache RAID SAS adapter and EXP24S
C. Storage Backplane with (18) SFF-8 Bays and Dual SAS controllers with write cache
D. Storage Backplane with (12) SFF-3 Bays integrated SAS controller
Answer: C

Posted 2018/7/5 16:14:48  |  Category: IBM  |  Tag: C9010-251 free study questionsC9010-251 practice papersC9010-251 test vce
Copyright © 2026. GetCertKey All rights reserved.