C2010-555 Study Reference Guide Question, C2010-555 Cram Training Paper

By blog Admin | Posted Wed, 18 Jul 2018 16:14:07 GMT
Valid C2010-555 Dumps shared by newpassleader.com for Helping Passing C2010-555 Exam! newpassleader.com now offer the newest C2010-555 exam dumps, the newpassleader.com C2010-555 exam questions have been updated and answers have been corrected get the newest newpassleader.com C2010-555 dumps with Test Engine here:
https://www.newpassleader.com/IBM/C2010-555-exam-preparation-materials.html
(70 Q&As Dumps, 30%OFF Special Discount: 30free)


NEW QUESTION NO: 40
What can be performed in the Assignments tab of Work Order Tracking?
A. Initiate an assignment into STARTED status.
B. Reassign from one person group to another.
C. Find an available crew for a type requirement.
D. Split an assignment to the labor code's next working shift.
Answer: C
Explanation/Reference:
Reference: http://publib.boulder.ibm.com/tividd/td/ITMfUtil/62_mx_tnd_ugadd/en_US/ PDF/62_mx_tnd_ugadd.pdf

NEW QUESTION NO: 41
A company is training on the use of the material status fields on work orders.
What are the possible status values available for these fields?
A. WMATL, AVAIL, NONE
B. COMP, NONE, PARTIAL
C. ONORDER, PAVAIL, READY
D. AVAIL, NOTAVAIL, PARTAVAIL
Answer: B
Explanation/Reference:
Reference: http://www-01.ibm.com/support/docview.wss?uid=swg21683844

NEW QUESTION NO: 42
An administrator has a requirement to ensure that purchase requisitions have been approved before being able to create purchase orders from them.
Which settings control this behavior?
A. Check the Require PR Approval on PO Creation? checkbox during the creation of the purchase requisition.
B. Check the purchasing option Require Approval to Convert PR to PO or Contract? (checkbox in Purchasing.
C. Clear the Allow PO Creation From Unapproved PR? checkbox in Purchasing Options.
D. Clear the Allow PO Creation From Unapproved PR? checkbox on the purchase requisition.
Answer: B

NEW QUESTION NO: 43
A company wants to refuse receipt on 2 of 7 items from a single PO Line which does not require inspection.
Which procedure will accomplish this and maintain the correct inventory balance?
A. Save the Receipt, Click the Select Receipts to Void button, Change the quantity to 5.
B. Save the Receipt, Click the Select Items for Return button on the PO Line, Change the quantity to 2.
C. Save the Receipt, Click the Select Receipts to Void button, Select the PO Line, Change the Quantity to
5.
D. Save the Receipt, Click the Select Items for Return button on the PO Line, Save the receipt, Receive the PO again, but change the Quantity due to 5.
Answer: C
Explanation/Reference:
Reference: http://www-01.ibm.com/support/docview.wss?uid=swg1IV75811

NEW QUESTION NO: 44
A rotating asset has been inspected and approved. The asset is then found to be faulty and needs to be returned to the vendor.
What will happen to the asset after it has been returned? (Choose two.)
A. Asset status will change to INACTIVE when there is no inventory balance.
B. Returned to Vendor checkbox has been selected and made read-only.
C. Asset record will be deleted after it has been returned.
D. Asset will be changed to a non-rotating asset and no longer reside in the storeroom.
E. Asset status will change to DECOMMISSIONED.
Answer: D,E

NEW QUESTION NO: 45
A company has users which perform a variety of roles from Planning, Purchasing, Maintenance and Management. The administrator needs to define which security groups to access which KPIs.
What application is used for this?
A. KPI Templates
B. Security Groups
C. Users
D. KPI Manager
Answer: B

NEW QUESTION NO: 46
An administrator want to create a time based escalation point to evaluate to 30 days in the future.
What is the correct value to use in the Elapsed Time Interval field along with the Elapsed Time Attribute?
A. Today + 30
B. +30 (positive 30)
C. Sysdate + 30
D. -30 (negative 30)
Answer: B

NEW QUESTION NO: 47
A company has a requirement to share calendar, classification, job plan, item description and PM data.
What needs to be created?
A. Multiple organizations with multiple sites per organization environment
B. Single organization, single site environment
C. Multiple organizations with one site per organization environment
D. Multiple organizations with a shared site environment
Answer: B

NEW QUESTION NO: 48
An engineer schedules a very complex asset report developed in BIRT. The engineer needs to set a feature to be able to retrieve the report contents from within Maximo for very large files that are restricted by the email server.
Which feature does this?
A. Email with a File Attachment
B. Direct Print
C. Email with a File URL
D. REPORTSCHEDULE cron task
Answer: D

NEW QUESTION NO: 49
A company has a requirement to report on actual labor hours, materials, services and tools used as work progresses on a work order.
What is the earliest point in the basic life cycle a user can start reporting?
A. APPR
B. COMP
C. WMATL
D. WAPPR
Answer: A
Explanation/Reference:
Reference: http://www-01.ibm.com/support/docview.wss?uid=swg21683844

NEW QUESTION NO: 50
The business analyst for the purchasing department of a company is creating a workflow process for purchase requisitions. A requirement is to branch the process to different approval groups based on a cost evaluation.
Which method is used to implement this in Workflow Designer?
A. A manual input with a custom action list.
B. A call out to the purchasing thresholds of the roles.
C. A condition node with an expression.
D. An interaction node to review the PR lines.
Answer: C

Posted 2018/7/18 16:14:07  |  Category: IBM  |  Tag: C2010-555 training paperC2010-555 guide questionC2010-555 study reference prep
Copyright © 2026. GetCertKey All rights reserved.